Most WordPress projects follow the same six stages. The time each takes shifts with the size of the site, but the order rarely changes.
Discovery and scoping, 2 to 5 days. You explain the goals, the audience, the pages you think you need and any features such as booking forms, memberships or a shop. The agency turns that into a fixed quote and a page list. The tighter your brief, the quicker this goes. Our guide on how to brief a web designer shows what to prepare.
Structure and design direction, 3 to 7 days. This covers the sitemap, the homepage layout and the visual style. Agreeing the homepage first is sensible because it sets fonts, colours and spacing for everything else. Our guide to what a homepage should include helps you prepare for this stage.
Build, 5 to 15 days. The pages are built in WordPress, usually with a page builder such as Elementor so your team can edit them later. Forms, menus, speed settings and mobile layouts are set up here.
Content loading, 2 to 7 days. Real copy and real images go in. If your content is ready, this overlaps with the build. If it is not, this is where the timeline stretches.
Review and revisions, 3 to 10 days. You test the site, give consolidated feedback and the agency makes changes. We include unlimited revisions during the project, but each round adds days, so consolidated feedback keeps things moving.
Testing and launch, 1 to 3 days. Final checks on speed, forms, links, cookie banners and browsers, followed by going live. Our process page describes how we handle the sequence.